Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/12/2008 Audit 0.00 0.00 0.00 0.00 0.00 0.00 116,736.00 116,736.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 116,736.00 116,736.00