Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/12/2008 Payment 0.00 0.00 0.00 0.00 6,543.58 0.00 104,685.39 111,228.97
2 08/14/2008 Payment 0.00 0.00 0.00 0.00 1,945.65 0.00 470.09 2,415.74
3 12/10/2008 Audit 0.00 0.00 0.00 0.00 1,999.77 0.00 4,429.52 6,429.29
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 10,489.00 0.00 109,585.00 120,074.00