Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/01/2013 Payment 0.00 0.00 4,162.11 0.00 3,918.04 1,666.66 87,386.19 97,133.00
TOTAL PAYMENTS 0.00 0.00 4,162.11 0.00 3,918.04 1,666.66 87,386.19 97,133.00