Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/09/2021 Payment 0.00 0.00 5,130.00 0.00 0.00 0.00 0.00 5,130.00
2 07/17/2023 Payment 0.00 0.00 -272.97 0.00 0.00 0.00 48,783.30 48,510.33
3 08/15/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 71,364.21 71,364.21
4 09/07/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 249,304.76 249,304.76
5 05/15/2024 Audit 0.00 0.00 21,986.61 0.00 16,104.45 0.00 44,987.64 83,078.70
TOTAL PAYMENTS 0.00 0.00 26,843.64 0.00 16,104.45 0.00 414,439.91 457,388.00