Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/13/2006 Audit 0.00 0.00 430.00 0.00 430.00 7,377.11 36,254.89 44,492.00
TOTAL PAYMENTS 0.00 0.00 430.00 0.00 430.00 7,377.11 36,254.89 44,492.00