Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/31/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 32,446.35 32,446.35
2 11/04/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 36,733.60 36,733.60
3 12/02/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 20,599.05 20,599.05
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 89,779.00 89,779.00