Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/12/2018 Audit 0.00 0.00 0.00 0.00 0.00 0.00 18,593.00 18,593.00
2 11/01/2018 Audit 0.00 0.00 0.00 0.00 0.00 0.00 843.00 843.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 19,436.00 19,436.00