Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/27/2023 Payment 0.00 0.00 3,030.00 0.00 0.00 0.00 0.00 3,030.00
2 07/08/2024 Payment 0.00 0.00 0.00 0.00 0.00 2,050.10 0.00 2,050.10
3 09/16/2024 Payment 0.00 0.00 0.00 0.00 42,971.15 0.00 0.00 42,971.15
TOTAL PAYMENTS 0.00 0.00 3,030.00 0.00 42,971.15 2,050.10 0.00 48,051.25