Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/27/2023 Payment 0.00 0.00 10,873.76 0.00 0.00 0.00 0.00 10,873.76
2 11/14/2024 Audit 0.00 0.00 6,134.24 0.00 9,257.00 0.00 135,268.00 150,659.24
TOTAL PAYMENTS 0.00 0.00 17,008.00 0.00 9,257.00 0.00 135,268.00 161,533.00