Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/21/2012 Payment 0.00 0.00 0.00 0.00 0.00 2,391.81 0.00 2,391.81
2 09/05/2012 Payment 0.00 0.00 0.00 0.00 0.00 0.00 33,614.43 33,614.43
3 01/28/2013 Audit 0.00 0.00 0.00 0.00 3,056.03 0.01 -3,055.28 0.76
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,056.03 2,391.82 30,559.15 36,007.00