Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/19/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 102,627.00 102,627.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 102,627.00 102,627.00