Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/18/2011 Payment 0.00 0.00 7,256.57 0.00 920.82 0.00 0.00 8,177.39
2 11/02/2011 Payment 0.00 0.00 1,928.73 0.00 1,772.88 0.00 92,505.10 96,206.71
3 01/20/2012 Audit 0.00 0.00 -1,929.30 0.00 1,929.30 0.00 12,588.90 12,588.90
TOTAL PAYMENTS 0.00 0.00 7,256.00 0.00 4,623.00 0.00 105,094.00 116,973.00