Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/09/2008 Payment 0.00 0.00 0.00 0.00 7,606.63 0.00 0.00 7,606.63
2 09/15/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 15,965.45 15,965.45
3 09/16/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 -5,775.87 -5,775.87
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 7,606.63 0.00 10,189.58 17,796.21