Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/07/2008 Audit 0.00 0.00 0.00 0.00 0.00 0.00 21,464.89 21,464.89
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 21,464.89 21,464.89