Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/09/2008 Payment 0.00 0.00 0.00 0.00 7,606.63 0.00 0.00 7,606.63
2 09/15/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 24,269.96 24,269.96
3 09/16/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 -6,952.70 -6,952.70
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 7,606.63 0.00 17,317.26 24,923.89