Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/14/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 47,432.55 47,432.55
2 07/31/2023 Audit 0.00 0.00 0.00 0.00 0.00 0.00 2,496.45 2,496.45
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 49,929.00 49,929.00