Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/05/2020 Payment 0.00 0.00 5,576.50 0.00 0.00 0.00 0.00 5,576.50
2 08/16/2021 Payment 0.00 0.00 370.00 0.00 5,189.60 24,088.63 30,480.45 60,128.68
3 10/22/2021 Payment 0.00 0.00 0.00 0.00 1,523.00 808.50 16,390.00 18,721.50
TOTAL PAYMENTS 0.00 0.00 5,946.50 0.00 6,712.60 24,897.13 46,870.45 84,426.68