Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/01/2017 Payment 0.00 0.00 0.00 0.00 0.00 0.00 44,403.01 44,403.01
2 09/28/2017 Payment 0.00 0.00 0.00 0.00 0.00 0.00 16,716.19 16,716.19
3 11/13/2017 Audit 0.00 0.00 0.00 0.00 0.00 0.00 31,566.80 31,566.80
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 92,686.00 92,686.00