Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/02/2024 Payment 0.00 0.00 24,992.50 0.00 0.00 0.00 0.00 24,992.50
2 07/15/2024 Payment 0.00 0.00 0.00 0.00 39,232.50 0.00 431,367.38 470,599.88
3 07/25/2024 Payment 0.00 0.00 0.00 0.00 335.00 0.00 0.00 335.00
4 09/13/2024 Audit 0.00 0.00 -0.50 0.00 12,440.50 0.00 155,798.62 168,238.62
TOTAL PAYMENTS 0.00 0.00 24,992.00 0.00 52,008.00 0.00 587,166.00 664,166.00