Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/22/2020 Payment 0.00 0.00 0.00 0.00 0.00 2,373.87 44,858.00 47,231.87
2 11/02/2020 Audit 0.00 0.00 0.00 0.00 0.00 2,906.94 -0.81 2,906.13
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 5,280.81 44,857.19 50,138.00