Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
---|---|---|---|---|---|---|---|---|---|---|
1 | 02/02/2009 | Audit | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 15,095.75 | 15,095.75 |
TOTAL PAYMENTS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 15,095.75 | 15,095.75 |