Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/07/2016 Payment 0.00 0.00 0.00 0.00 0.00 0.00 1,640.66 1,640.66
2 12/23/2016 Payment 0.00 0.00 0.00 0.00 1,938.26 0.00 19,382.62 21,320.88
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 1,938.26 0.00 21,023.28 22,961.54