Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/27/2008 Payment 0.00 0.00 0.00 0.00 0.00 291.06 0.00 291.06
2 07/30/2008 Payment 0.00 0.00 0.00 0.00 0.00 161.70 0.00 161.70
3 01/28/2009 Audit 0.00 0.00 0.00 0.00 0.00 -452.76 9,137.00 8,684.24
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 9,137.00 9,137.00