Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/10/2020 Payment 0.00 0.00 9,773.36 0.00 0.00 0.00 0.00 9,773.36
2 06/18/2020 Payment 0.00 0.00 0.00 0.00 3,451.05 0.00 0.00 3,451.05
3 07/14/2020 Payment 0.00 0.00 0.00 0.00 1,759.35 0.00 0.00 1,759.35
4 08/03/2020 Audit 0.00 0.00 482.64 0.00 5,045.60 0.00 112,195.00 117,723.24
5 10/29/2020 Audit 0.00 0.00 0.00 0.00 0.00 0.00 -1,677.70 -1,677.70
TOTAL PAYMENTS 0.00 0.00 10,256.00 0.00 10,256.00 0.00 110,517.30 131,029.30