Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/25/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 55,348.16 55,348.16
1 11/12/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 -55,348.16 -55,348.16
2 11/16/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 55,348.16 55,348.16
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 55,348.16 55,348.16