Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/15/2023 Audit 0.00 0.00 0.00 0.00 0.00 2,860.00 0.00 2,860.00
2 11/15/2023 Adjustment 0.00 0.00 0.00 0.00 0.00 0.00 -2,860.00 -2,860.00
3 11/29/2023 Audit 0.00 0.00 0.00 0.00 0.00 2,860.00 0.00 2,860.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 5,720.00 -2,860.00 2,860.00