Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/30/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 85,333.75 85,333.75
2 08/14/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 2,381.25 2,381.25
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 87,715.00 87,715.00