Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/13/2018 Payment 0.00 0.00 10,154.48 0.00 0.00 0.00 0.00 10,154.48
2 08/01/2018 Payment 0.00 0.00 14,416.27 0.00 0.00 0.00 0.00 14,416.27
3 10/16/2018 Payment 0.00 0.00 0.00 0.00 0.00 0.00 171,576.70 171,576.70
4 10/25/2019 Audit 0.00 0.00 0.00 0.00 0.00 0.00 -17,917.45 -17,917.45
TOTAL PAYMENTS 0.00 0.00 24,570.75 0.00 0.00 0.00 153,659.25 178,230.00