Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/24/2020 Payment 0.00 0.00 2,287.00 0.00 0.00 0.00 0.00 2,287.00
2 04/10/2020 Payment 0.00 0.00 430.50 0.00 0.00 0.00 0.00 430.50
3 05/06/2020 Payment 0.00 0.00 4,355.02 0.00 0.00 0.00 0.00 4,355.02
4 06/30/2020 Audit 0.00 4,377.30 -7,072.52 0.00 2,718.18 0.00 7,587.52 7,610.48
TOTAL PAYMENTS 0.00 4,377.30 0.00 0.00 2,718.18 0.00 7,587.52 14,683.00