Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/26/2025 Audit 0.00 0.00 0.00 0.00 0.00 0.00 152,612.00 152,612.00
2 04/14/2025 Audit 0.00 0.00 0.00 0.00 0.00 0.00 5,322.00 5,322.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 157,934.00 157,934.00