Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/16/2020 Payment 0.00 0.00 753.67 0.00 0.00 0.00 0.00 753.67
2 06/11/2020 Payment 0.00 0.00 3,887.25 0.00 0.00 0.00 0.00 3,887.25
3 12/11/2020 Payment 0.00 0.00 0.00 0.00 0.00 0.00 77,569.14 77,569.14
4 01/28/2021 Audit 0.00 0.00 -1,696.91 0.00 0.00 0.00 4,498.77 2,801.86
5 02/16/2021 Audit 0.00 0.00 1,696.95 0.00 0.00 0.00 -0.95 1,696.00
TOTAL PAYMENTS 0.00 0.00 4,640.96 0.00 0.00 0.00 82,066.96 86,707.92