Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/01/2012 Payment 0.00 0.00 0.00 0.00 0.00 0.00 7,841.92 7,841.92
2 09/25/2012 Payment 0.00 0.00 0.00 0.00 0.00 0.00 17,755.14 17,755.14
3 10/19/2012 Payment 0.00 0.00 0.00 0.00 0.00 0.00 8,946.88 8,946.88
4 12/27/2012 Payment 0.00 0.00 0.00 0.00 0.00 0.00 388.65 388.65
5 04/01/2013 Payment 0.00 0.00 0.00 0.00 3,706.00 0.00 67.41 3,773.41
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,706.00 0.00 35,000.00 38,706.00