Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/01/2008 Audit 0.00 0.00 0.00 0.00 0.00 0.00 67,349.60 67,349.60
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 67,349.60 67,349.60