Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/15/2021 Audit 0.00 0.00 2,280.00 0.00 2,280.00 0.00 99,345.00 103,905.00
TOTAL PAYMENTS 0.00 0.00 2,280.00 0.00 2,280.00 0.00 99,345.00 103,905.00