Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/27/2021 Payment 0.00 0.00 2,700.00 0.00 0.00 0.00 0.00 2,700.00
2 08/09/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 106,214.75 106,214.75
3 09/10/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 76,398.24 76,398.24
4 10/06/2021 Payment 0.00 0.00 0.00 0.00 251.99 0.00 0.00 251.99
5 02/15/2022 Audit 0.00 0.00 0.00 0.00 2,084.01 0.00 9,611.01 11,695.02
TOTAL PAYMENTS 0.00 0.00 2,700.00 0.00 2,336.00 0.00 192,224.00 197,260.00