Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/06/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 132,405.78 132,405.78
2 10/27/2008 Audit 0.00 0.00 0.00 0.00 0.00 0.00 6,969.22 6,969.22
3 01/15/2009 Audit 0.00 0.00 0.00 0.00 0.00 3,228.00 0.00 3,228.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 3,228.00 139,375.00 142,603.00