Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/22/2006 Audit 0.00 0.00 0.00 0.00 0.00 749.99 9,423.01 10,173.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 749.99 9,423.01 10,173.00