Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/29/2020 Payment 0.00 0.00 0.00 0.00 0.00 1,288.44 55,008.53 56,296.97
2 12/31/2020 Audit 0.00 0.00 0.00 0.00 0.00 -1,288.47 1,288.47 0.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 -0.03 56,297.00 56,296.97