Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/30/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 268,751.57 268,751.57
2 11/14/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 14,144.43 14,144.43
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 282,896.00 282,896.00