Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/11/2020 Payment 0.00 0.00 28,780.00 0.00 0.00 0.00 0.00 28,780.00
2 11/12/2020 Payment 0.00 0.00 12,483.52 0.00 20,254.01 0.00 157,604.67 190,342.20
3 02/16/2021 Audit 0.00 0.00 48.48 0.00 4,336.99 0.00 8,295.33 12,680.80
TOTAL PAYMENTS 0.00 0.00 41,312.00 0.00 24,591.00 0.00 165,900.00 231,803.00