Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/15/2020 Payment 0.00 0.00 6,935.07 0.00 1,867.39 0.00 0.00 8,802.46
2 08/17/2020 Payment 0.00 0.00 0.00 0.00 1,759.18 0.00 44,818.20 46,577.38
3 12/01/2020 Audit 0.00 0.00 884.93 0.00 926.43 0.00 2,358.80 4,170.16
TOTAL PAYMENTS 0.00 0.00 7,820.00 0.00 4,553.00 0.00 47,177.00 59,550.00