Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/19/2012 Audit 0.00 0.00 0.00 0.00 448.00 0.00 64,334.00 64,782.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 448.00 0.00 64,334.00 64,782.00