Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/08/2023 Payment 0.00 0.00 13,518.69 0.00 2,154.79 123.16 61,406.04 77,202.68
2 11/29/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 150,599.76 150,599.76
3 10/15/2024 Audit 0.00 0.00 -1,534.45 0.00 1,657.56 27,328.01 11,158.44 38,609.56
TOTAL PAYMENTS 0.00 0.00 11,984.24 0.00 3,812.35 27,451.17 223,164.24 266,412.00