Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/20/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 29,957.64 29,957.64
2 11/19/2010 Payment 0.00 0.00 0.00 0.00 0.00 0.00 4,882.99 4,882.99
3 06/22/2011 Payment 0.00 0.00 0.00 0.00 0.00 0.00 5,149.41 5,149.41
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 39,990.04 39,990.04