Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/25/2006 Payment 0.00 0.00 0.00 0.00 0.00 0.00 39,410.59 39,410.59
2 12/07/2006 Audit 0.00 0.00 0.00 0.00 2,311.00 12,535.00 12,252.41 27,098.41
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 2,311.00 12,535.00 51,663.00 66,509.00