Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/15/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 6,406.47 6,406.47
2 08/27/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 56,033.37 56,033.37
3 10/20/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 2,603.12 2,603.12
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 65,042.96 65,042.96