Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/25/2021 Payment 0.00 0.00 8,109.53 0.00 0.00 0.00 0.00 8,109.53
2 10/14/2021 Payment 0.00 0.00 3,061.56 0.00 0.00 0.00 0.00 3,061.56
3 04/20/2022 Payment 0.00 0.00 1,356.66 0.00 0.00 0.00 0.00 1,356.66
4 08/30/2022 Payment 0.00 0.00 0.00 0.00 0.00 0.00 151,678.80 151,678.80
5 09/16/2022 Audit 0.00 0.00 0.25 0.00 336.00 0.00 8,635.20 8,971.45
TOTAL PAYMENTS 0.00 0.00 12,528.00 0.00 336.00 0.00 160,314.00 173,178.00