Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/12/2011 Payment 0.00 0.00 7,000.00 0.00 11,472.00 0.00 71,626.00 90,098.00
2 11/16/2011 Audit 0.00 0.00 0.00 0.00 220.04 0.00 8,299.96 8,520.00
TOTAL PAYMENTS 0.00 0.00 7,000.00 0.00 11,692.04 0.00 79,925.96 98,618.00