Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/24/2020 Payment 0.00 0.00 23,388.50 0.00 0.00 0.00 0.00 23,388.50
2 08/06/2020 Payment 0.00 0.00 0.00 0.00 13,340.25 0.00 0.00 13,340.25
3 09/15/2020 Payment 0.00 0.00 0.00 0.00 0.00 0.00 100,000.00 100,000.00
4 09/29/2020 Audit 0.00 0.00 -8,893.50 0.00 16,304.75 0.00 185,970.00 193,381.25
TOTAL PAYMENTS 0.00 0.00 14,495.00 0.00 29,645.00 0.00 285,970.00 330,110.00