Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/16/2013 Payment 0.00 0.00 0.00 0.00 19,832.56 0.00 61,993.20 81,825.76
2 11/06/2013 Payment 0.00 0.00 0.00 0.00 0.00 0.00 33,996.34 33,996.34
3 03/03/2014 Audit 0.00 0.00 0.00 0.00 -0.06 0.00 16,218.96 16,218.90
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 19,832.50 0.00 112,208.50 132,041.00